At the Freehold Regional High School District, we are deeply committed to enhancing our facilities and infrastructure; a vital investment that directly supports an environment where our students, staff, and entire community can thrive.

These projects are about more than just buildings - they reflect our shared values. They ensure our spaces are modern, efficient, and inspiring for everyone.

We are proud to share our completed improvements for the 2025-2026 school year and look forward to the planned initiatives for 2026-2027. Each step we take is part of our commitment to fostering growth, engagement, and building a high-quality, sustainable campus that serves as a source of pride for our community. Your support makes this dedication to a thriving educational environment possible.

Completed Projects

Safety and Security

  • Security Vestibule - Security Vestibule was installed in the lobby of Freehold High School.
  • Security Camera System Upgrade - Security Camera Systems were upgraded at Freehold High School, Freehold Township High School, Howell High School, Manalapan High School, and Marlboro High School.
  • Security Panic Button Upgrade - Security Panic Buttons were upgraded in all high schools.
  • Exterior Signage - Exterior Signage was added to Freehold High School.

Roofing

  • Main Gym Roof - Main Gym Roof was replaced at Marlboro High School.

Heating, Ventilation, and Air Conditioning

  • Boiler Replacement - Boilers were replaced at Colts Neck High School, Freehold Township High School, Howell High School, Manalapan High School and Marlboro High School.
  • Air Conditioning Installation  - Window Unit Air Conditioning were installed in second story classrooms at Freehold High School, Freehold Township High School, Howell High School, Manalapan High School, and Marlboro High School.
  • Roof Top Unit (RTU) Replacement - Roof Top Air Conditioning Units have been replaced at Freehold High School, Freehold Township High School, Howell High School, Manalapan High School, and Marlboro High School.

Paving and Concrete Walkways

  • Paving and Concrete Walkways - Concrete walkways were replaced at Colts Neck High School and Freehold Township High School.
  • Student Parking Lot Paving - Athletic and Student Parking lot was repaved at Manalapan High School.
  • Paving - The front driveway has been repaved and sections of sidewalk have been replaced at Freehold Township High School.
  • Paving - The front parking lots have been repaved at Marlboro High School.

Instructional Spaces

  • Technology Education Lab - State of the Art Technology Education Lab was built at Manalapan High School.

Common Educational Spaces

  • Auditorium Refurbishment - Auditorium was refurbished at Freehold High School.
  • Auditorium Sound System Upgrade - Sound System was upgraded at Freehold High School.
  • Auditorium Stage Refurbishment - Stage Floor was replaced at Freehold Township High School and Marlboro High School.
  • Courtyard Refurbishment - Student Courtyard was revitalized with fresh hardscaping and landscaping at Freehold High School.
  • Auditorium Stage Floor Replacement - Auditorium Stage Floor was replaced at Manalapan High School.
  • Auditorium Carpet Replacement - Auditorium Carpet was replaced at Manalapan High School.

Athletics and Physical Education

  • Main Gym Floor Replacement - Main Gym Floor was replaced at Freehold Township High School.
  • Main Gym Floor Graphics - Main Gym Floor Graphics were upgraded at Colts Neck High School.
  • Main Gym Wall and Ceiling Painting - Main Gym Walls and Ceiling were painted at Manalapan High School and Marlboro High School.
  • Turf Athletic Field - Turf Field was installed at Marlboro High School courtesy of Marlboro Township.
  • Main Gym Video Score Board - Scoreboard was replaced with a Video Scoreboard in the Gym at Colts Neck High School.
  • Main Gym Bleacher Replacement - Bleachers in the Main Gym have been replaced at Freehold Township High School and Manalapan High School.
  • Auxiliary  Gym Floor - Auxiliary Gym Floor has been refinished at Freehold Township High School.
  • Tennis Court Replacement - New Tennis Courts have been installed at Colts Neck High School and Marlboro High School.
  • Gym Wall Pad Replacement - Wall Pads were replaced in the Gray Gym at Manalapan High School.

Site 

  • Outdoor Marquee - Outdoor Marquees were replaced at Colts Neck High School, Freehold High School, and Marlboro High School. 
  • Water Treatment Plant Refurbishment - The Water Treatment Plant was refurbished at Colts Neck High School.

Work in Progress

Safety and Security

  • Security Camera System Upgrade - Security Camera Systems are being upgraded at Colts Neck High School.

Roofing

  • Roof Replacement - Roofing is being replaced at Howell High School, Manalapan High School, and Marlboro High School.

Instructional Spaces

  • Science Lab Renovation - Science Labs and Classrooms are being renovated at Freehold High School, Freehold Township High School, Howell High School, Manalapan High School, and Marlboro High School.

Infrastructure

  • Generator Connectivity Upgrade - Additional operational equipment is being connected to the Generators at all high schools.

Athletics and Physical Education

  • Tennis Court Replacement - New Tennis Courts are being installed at Freehold High School and Howell High School.
  • Main Gym Floor Replacement - Main Gym Floors are being replaced at Freehold High School, Manalapan High School, and Marlboro High School.
  • Main Gym Bleacher Replacement - Bleachers in the Main Gym are being replaced at Freehold High School and Marlboro High School.

Upcoming Projects

Safety and Security

  • Fire Alarm Notification System Upgrade - Fire Alarm Notification System will be upgraded during the 2026 - 2027 school year at Manalapan High School.
  • Exterior Signage - Exterior Signage will be added to Freehold Township High School, Manalapan High School, and Marlboro High School.

Heating, Ventilation, and Air Conditioning

  • Chiller Replacement - Chillers that provide Air Conditioning will be replaced at Colts Neck High School and Freehold High School.